Stormwater SWPPP/SPCC Plan


SWPPP/SPCC Integrated Plan
Additional Resources: ENSAT Resource Dashboard
Click on the active links to view content of the SWPPP Section

SWPPP Updated Plan 
(File an electronic copy in folders below by year and insert a link to the document for quick reference)

Figures
Figure 1; Site Location (Topographic) Map  (Site Map)
Figure 2; Site Layout and Drainage Map (Site Map)

Tables
(Tables are located in a google sheets workbook at this link)
The integrated stormwater management module comes with a "stormwater  GOOGLE Sheets workbook template" containing the tables outlined below and select appendices. In a clients version each table listing contains a link to that specific table and includes GOOGLE revision control.   

Table 1 Summary of ASTs/USTs Storage Containers & Capacity
Table 2 Total Oil Capacity
Table 2-1 Summary of Oil Filled Equipment
Table 2-2 Summary of Oil Filled Containers
Table 2-3 Secondary Containment and Oil Spill Calculations
Table 3 Stormwater Sampling Analytical Results
Table 4 Best Management Practices List (BMPs)
Table 5 Inspection Log & Schedule
Table 6 Emergency Response & Spill Coordinators
Table 7 NRC Reporting Procedures
Table 8 Oil Discharge Contingency Plan
Table 9 General Rule Requirements for Onshore Facilities (excluding production)
Table 10 Inspections, Dike Drainage, and Personnel Training Logs

Appendices
Appendix A Material Inventory & Exposure Evaluation Documentation
Appendix F Corrective Action Report
Appendix G Discharge Monitoring Reports
Appendix H SWPPP Pollution Prevention Team
    I.1 SWPPP Team Meeting Minutes
Appendix I  Comprehensive Site Evaluations
Appendix J Site Inspections
    J.1 SWPPP Routine Site Inspections - Completed inspection Documentation 
        J.1.1 Routine Qtrly Site Inspection Workbook Form
    J.2 SPCC
        J.2.1 Monthly (ASTs and Portable Containers)
        J.2.2 Yearly (ASTs) 
        J.2.3 10-year (ASTs)
    M.1 SWPPP
                M.1.1.1 Workbook Form: Certification of Non-Stormwater Discharges
    M.2 SPCC
        M.2.2 SPCC Written Commitment of Manpower
        M.2.3 Certificate of Substantial Harm 
Appendix N SPCC & SWPPP Plan Amendments
Appendix O Best Management Practices Supporting Documentation
    O.1 BMP #1 Supporting Documentation
    O.2 BMP#2 Supporting Documentation
Appendix P TRI Reporting
Appendix Q Chesapeake Bay Restoration Requirements (Varies by permit and jurisdiction)

VDEQ TMDL information is available at by searching VDEQ Final TMDL report list
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser