Oil/Water Separators

SelectionFile type iconFile nameDescriptionSizeRevisionTimeUser
ċ

View
Grasso discusses the issue of having to install 107(49) OCM's on 60(33) OWS equipment when the OCM is replaced  Mar 23, 2015, 11:35 AM Bill Graves
ċ

View
This is a USCG policy letter that discusses inspection issues with 107(49) systems. It discusses OCM calibration procedures (At least once every five years at IOPP renewal)  Mar 23, 2015, 8:23 AM Bill Graves
ċ

View
This paper is the result of a SNAME (Society of Naval Architects & Marine Engineers) Ad Hoc panel effort over five years, with input provided by dozens of engineers on the subject. It includes a detailed description of the OWS system and has been reprinted in slightly modified formats, including in the Indian Journal of Marine Engineering and the Baltic Exchange journal.  Mar 23, 2015, 11:41 AM Bill Graves
ċ

View
This is a practical discussion of issues that occur during bilge oil water separation and methods to deal with them  Mar 23, 2015, 8:28 AM Bill Graves
Comments